HOME                                                                                                                                                          FREE Commercial Project & Planning Assistance

                              

  Benefits:

 

•  Economic

 

•  Environmental

 

•  Curb Appeal

 

•  Fast Placement

 

  Applications:

 

 Conventional
    Concrete Parking

 

 Pervious Concrete

 

 Parking Structures

 

 Concrete Streets

 

 WhiteTopping

 

 Ultra-Thin

    WhiteTopping

 

 Concrete Paths

 

 Concrete Curbs
    and Gutters

 

Resources

 

Industry Links

 

Concrete Publications

 

Link to Us

 

 

 

 

 

 

 

 

 

Concrete Whitetopping

Evaluating an Existing Parking Lot

 

    To ensure satisfactory performance of a new concrete overlay, the factors that caused deterioration of the existing asphalt parking lot need to be corrected and recognized in the design. The engineer should examine the existing pavement to find the probable reasons for its deterioration. Asphalt pavement failures are generally due to one or more of these factors:

 

  • Heavy traffic

 

  • Drainage problems

 

  • Poor construction

 

  • Inadequate subgrade conditions

 

  • Substandard conditions

 

 

                                                                                 Next >> Overlay Thickness Design                

 

    

 

 

 

 

 

 

 

ConcreteAnswers

 for Architects,

 Engineers and

 Developers:

 

ConcreteAnswers.org

PerviousPavement.org

ConcreteStreets.org

GreenConcrete.info

ConcreteBuildings.org

SelfConsolidating

Concrete.org

FlowableFill.org

GreenRoofTops.org

 

 

 

About NRMCA  |  Privacy Statement

© National Ready Mixed Concrete Association, 2010