Concrete Whitetopping Drainage and Grade Problems
In some cases, it may not be possible to raise the elevations of existing curbs or building entrances. In these situations, the existing pavement abutting the structure should be removed in a tapered section out to the location of the first joint in the concrete over-lay. Underlying materials in the section should be adequately compacted. At vehicle entrances, the thick end of the tapered section should be excavated to allow for an additional 20-25% thickness of the concrete. This increased thickness compensates for the support lost by removing the original pavement material.